Four terms – four different statements
A highly detailed model can be based on inaccurate measurement data. Conversely, a very precise point cloud can be transformed into a deliberately simple model. Therefore, accuracy, geometry, and information are defined separately.
| Concept | What is being described? | Important distinction |
|---|---|---|
| LOA Level of Accuracy |
Accuracy level of the recorded inventory data and the geometry represented from it | No statement is made about how many components or attributes are modeled. |
| LOD Level of Development |
Development and reliability level of a model element | Not to be equated with a millimeter tolerance |
| LOG Level of Geometry |
Scope and complexity of the geometric representation | Describes the geometry, not the alphanumeric properties. |
| LOI Level of Information |
Required alphanumeric information such as component type, material, identification, or status | Additional attributes are only useful if they are needed for a defined purpose. |
LOA: How accurate are the measurements and the display?
The LOA (Level of Accuracy) system of the US Institute of Building Documentation distinguishes between Measured Accuracy and Represented Accuracy . This considers, on the one hand, how accurately the actual inventory was recorded, and on the other hand, how accurately a drawing or model represents this inventory. The level should therefore not be derived solely from a scanner's data sheet.
| LOA level | Tolerance range according to USIBD | classification |
|---|---|---|
| LOA 10 | over 50 to 150 mm | Rough inventory overview and spatial orientation |
| LOA 20 | over 15 to 50 mm | Overview planning and inventory models with moderate requirements |
| LOA 30 | over 5 to 15 mm | Many planning, coordination and scan-to-BIM tasks |
| LOA 40 | over 1 to 5 mm | Increased requirements for connections, surfaces or component geometry |
| LOA 50 | 0 to 1 mm | Special high-precision documentation and testing tasks |
LOD 100 to LOD 500: How reliable is the model element?
The BIMForum system uses LOD as Level of Development . It describes not only visible details, but above all the extent to which project stakeholders can rely on the contained geometry and information.
| LOD level | Typical meaning |
|---|---|
| LOD 100 | Conceptual or symbolic representation; not yet a reliably measurable component geometry. |
| LOD 200 | Generic or schematic components with approximate size, shape, position and orientation |
| LOD 300 | Geometrically defined components; quantity, size, shape, position and orientation can be derived from the model. |
| LOD 350 | Like LOD 300, supplemented by relevant interfaces to adjacent or dependent components. |
| LOD 400 | Design for manufacturing, assembly or installation; typically with manufacturing-related expertise |
| LOD 500 | Representation of an existing or implemented state based on observation, on-site inspection, or interpolation; the accuracy must be specified separately. |
LOG, LOI and today's level of information requirements
LOG describes the required geometric form, LOI the scope of alphanumeric information. The current DIN EN ISO 7817-1 standard summarizes the ordering process more modernly as Level of Information Need . The starting point is the specific purpose. Based on this, geometric information, alphanumeric information, and required documents are defined.
- Purpose: What decision or process should be supported?
- Geometry: What components, shapes, openings, and connections are needed?
- Information: What attributes, labels, and classifications are required?
- Documentation: What plans, test reports, or supplementary documents are included in the handover?
Example of a unique order
Not: "We need a BIM model in LOD 300."
Rather: “Load-bearing components and relevant openings are geometrically represented in LOD/LOG 300. For defined connection areas, a representational accuracy of LOA 30 applies. Required attributes are component type, material – insofar as recognizable – and inventory status. Non-visible components are not added to the design but are marked as assumed.”
What should be determined before the contract is awarded?
- Later use of the model and responsible departments
- Component catalog with different requirements for each element group
- Measured and displayed accuracy including test methods
- LOG/Geometry, LOI/Attributes and required documentation
- Dealing with hidden areas, assumptions and unrecorded components
- Target format, coordinate system, model structure and transfer rules
Relevant topics and applications
Frequently asked questions
Is LOA identical to the scanner's measurement accuracy?
No. The performance of the measurement system is only one component. LOA can describe both the accuracy of the acquired data and the accuracy of the geometry represented from it. Registration, control mesh, acquisition conditions, modeling, and verification all influence the result.
Does LOD 400 automatically mean an accuracy of a few millimeters?
No. LOD and LOA describe different properties. LOD 400 concerns the manufacturable development of a model element; geometric accuracy must be agreed upon separately.
Is LOD 500 more detailed than LOD 400?
Not necessarily. According to BIMForum, LOD 500 denotes an existing or completed state determined through observation, on-site inspection, or interpolation. The accuracy must be specified separately.
Which stage is appropriate for an inventory model?
This depends on the use and the component. Different geometry, information, and accuracy requirements may be appropriate within the same project for layout planning, system connections, and monument documentation.
Normative and technical foundations
The classification is based on the USIBD Level of Accuracy Specification , the BIMForum LOD Specification , and the DIN EN ISO 7817-1 standard maintained by DIN regarding the level of detail required for information . Contractual requirements and project-specific tolerances take precedence over general examples.