Knowledge · Data exchange

Choosing the right data formats for point clouds, CAD and BIM

E57, RCP, DWG, Revit or IFC: The appropriate format depends on the software, workflow and desired further processing.

In a nutshell

The technically possible format is not automatically the best one in practice. File size, coordinates, version, and required structure must all be compatible.

Point clouds are often transferred as E57, RCP/RCS, LAS/LAZ, or XYZ. 2D plans usually use DWG, DXF, or PDF. BIM models can be provided natively in Revit or as an open IFC model. The receiving software should be checked before the project begins.

When is this topic relevant?

  • Tender for a digital inventory management system
  • Preparation of CAD and BIM workflows
  • Data exchange between different planners
  • Long-term archiving of inventory data

What results can you expect?

  • Harmonized native and neutral file formats
  • Documented coordinate and unit system
  • Meaningful division of large data sets
  • Test file or handover check by arrangement

What are the key factors when commissioning a service?

Software versions, units, origin, axes, and file sizes often cause avoidable problems. A quick test handover can save a lot of time in large projects.

Helpful for a reliable inquiry: Project goal, location, relevant areas, desired accuracy, existing documents, target format and time frame.

From need to usable data basis

Step What will be clarified?
Task 1 Usage, areas, accuracy and result format
2. Recording Access, security, measurement method and spatial reference
3. Preparation Registration, testing, evaluation and modeling
4. Handover Data structure, quality control and instruction

Relevant topics and applications

Frequently asked questions

What information do you need for a quote?

Helpful information includes the location, approximate size, any existing plans or photos, desired outcome, and timeframe. We will clarify any open technical points together.

How is the required accuracy determined?

Accuracy is derived from the intended use. Different requirements apply to an area overview than to plant connections or a detailed BIM model.

Can existing plans be incorporated?

Yes. Existing documents can serve for preparation, orientation, and supplementation. Deviations from the recorded data will be handled transparently.

In what formats is the data transferred?

Depending on the project, we deliver formats including E57, RCP/RCS, LAS/LAZ, DWG, DXF, Revit, IFC, and PDF. The target format is agreed upon before the project begins.

Your project

What data basis does your planning require?

We will clarify the method, scope and output format to suit your task.

Discuss the project