In a nutshell
A comparable offer requires a clear scope of services: What should be recorded and what result must the planning team achieve?
The costs comprise project preparation, on-site data collection, registration, quality control, and the desired analysis. A pure point cloud project requires a different cost estimate than a complete BIM model with building services engineering and a defined scope of information.
When is this topic relevant?
- Budgeting before project start
- Comparison of offers
- Establishing sensible priorities and sub-areas
- Avoiding additional costs due to unclear results
What results can you expect?
- Clearly defined scope of services
- Options for data collection and analysis
- Named assumptions and contributions
- Clearly defined result and transfer formats
What are the key factors when commissioning a service?
To provide a reliable quote, we need information such as location, property size, photos or plans, accessible areas, security requirements, desired dates, and timeframe. Any remaining questions can be clarified in a brief planning meeting.
From need to usable data basis
| Step | What will be clarified? |
|---|---|
| Task 1 | Usage, areas, accuracy and result format |
| 2. Recording | Access, security, measurement method and spatial reference |
| 3. Preparation | Registration, testing, evaluation and modeling |
| 4. Handover | Data structure, quality control and instruction |
Relevant topics and applications
Frequently asked questions
What information do you need for a quote?
Helpful information includes the location, approximate size, any existing plans or photos, desired outcome, and timeframe. We will clarify any open technical points together.
How is the required accuracy determined?
Accuracy is derived from the intended use. Different requirements apply to an area overview than to plant connections or a detailed BIM model.
Can existing plans be incorporated?
Yes. Existing documents can serve for preparation, orientation, and supplementation. Deviations from the recorded data will be handled transparently.
In what formats is the data transferred?
Depending on the project, we deliver formats including E57, RCP/RCS, LAS/LAZ, DWG, DXF, Revit, IFC, and PDF. The target format is agreed upon before the project begins.
